Hi,
I have checked by keeping $Self.RM_COMP_Quantity = ROLLS/3 & found OK .But B.o.M Explosion based on specified logic as Rolls/3 Not exploding.Please help in B.o.M how these component quantity could be exploded as desired.
Header material XXX-variant-----Base quantity-----------1kg
Component material Pallet------------Component quantity--999Ea
Dependencies for Component:
Selection condition---packingmode='PL'
Procedure----------------$Self.RM_COMP_Quantity = ROLLS/3.
In sales order rolls =30 & Sales order Quantity=5473.44kg
Now MRP run sucessful with B.o.M explosion as per selection condition but in MD04---PALLET quantity is populated as Base quantity= 54,735EA.(Here pallet quantity should explode as Rolls/3=30=10EA as per procedure written in B.o.M) System not considering procedure at all.
Regards,
Smoke